3Egreen
  • About 3Egreen
    • Our Story
    • Mission & Vision
  • Solution
    • Energy Consumption Inventory
    • Electricity Management
  • Products
    • Cloud platform(3Enlighten)
    • Smart Clamp Meter
    • Gateway
  • Successful Cases
  • News
    • Event
  • Contact us
    • FAQ
    • Catalog
  • 繁體中文
3Egreen
  • About 3Egreen
    • Our Story
    • Mission & Vision
  • Solution
    • Energy Consumption Inventory
    • Electricity Management
  • Products
    • Cloud platform(3Enlighten)
    • Smart Clamp Meter
    • Gateway
  • Successful Cases
  • News
    • Event
  • Contact us
    • FAQ
    • Catalog
  • 繁體中文
  • About 3Egreen
    • Our Story
    • Mission & Vision
  • Solution
    • Energy Consumption Inventory
    • Electricity Management
  • Products
    • Cloud platform(3Enlighten)
    • Smart Clamp Meter
    • Gateway
  • Successful Cases
  • News
    • Event
  • Contact us
    • FAQ
    • Catalog
  • 繁體中文
3Egreen
3Egreen
  • About 3Egreen
    • Our Story
    • Mission & Vision
  • Solution
    • Energy Consumption Inventory
    • Electricity Management
  • Products
    • Cloud platform(3Enlighten)
    • Smart Clamp Meter
    • Gateway
  • Successful Cases
  • News
    • Event
  • Contact us
    • FAQ
    • Catalog
  • 繁體中文

A well-known machine tool factory in Taiwan

31 Likes
Products:
Current meter
Temperature senor
Cloud platform

Pain point 1: Abnormal ice water host

Troubleshooting: There are ice water hosts A and B. After observing the cloud data, it is found that under the operating condition of 12°C, device Acan operate at full power, but device B often sleeps. This leads to a reduction in the service life of equipment A, accelerated aging, and so on.

Pain point two: Device power consumption

Troubleshooting:1. The air compressor was originally pumped at 7kg, but through the cloud platform data, it was gradually reduced to 6kg, which can still operate normally, saving a considerable amount of electricity.
2. The ice water host C operates at 8 ℃ in the past. After referring to the cloud data, it is finally adjusted to 16 ℃, and the cooling effect can still be achieved. (Note 1).
(Note 1) According to the information in Government , the ice water host can save 6% of the power consumption of air-conditioning for every 1°C increase.

The benefits :

Improve the limits of equipment parameters, maintain production, and optimize power consumption

Subsequent expand to others including mixers, hot extruders, grinders, dust collectors, mold temperature machines, dust collectors, blowers, and mold temperature machines.

SHARE ARTICLE
FacebookLinkedin

NEXT

About 3Egreen

3Egreen Technology was founded in 2014. We provide an energy intelligent management service system , which can monitor and analyze the power consumption of each machine, and even calculate the carbon emission of each device. We help our customers to initiate the transformations of digitization and Net Zero Carbon Emissions. There have had a lot of clients in domestic and foreign.

Fa-facebook-fFa-youtubeFa-lineFa-linkedin

Contact us

16F.-3, No.700, Zhongzheng Rd., Zhonghe Dist., New Taipei City 235, Taiwan (R.O.C.)

+886-2-82278592

curtis.wu@3egreen.com , Adam.lee@3egreen.com, sales@3egreen.com

© 2014-3Egreen All Rights Reserved