World-class sports field paving manufacturing factory
Products:
Pain point 1: Contract capacity exceeds
Troubleshooting:According to the "Equipment Power Consumption Ranking" analyzed by the cloud platform, observe the top three power consuming devices and see if there would be improved. The power consumption is abnormally high at noon without peak period. It's improved the over-appointment problem by adjusting the use time of the equipments.
Pain point 2: Unable to judge the cleaning time of the air compressor
Troubleshooting: It only takes 3-4 days to go to the site for cleaning, saving redundant labor costs with the data on the platform.
Pain point 3: Unable to monitor the status of the operating equipment
Troubleshooting: Set up alert notifications, you can receive notifications by the APP platform, and accurately manage if the on-site equipment is operating normally.
The benefits :
It’s saved NT$250,000 a year that compare with the summer electricity bill in the same period of the previous year.